Difference between revisions of "Project costs com/en/"

From Help.4pm
Jump to navigationJump to search
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=Project cost=
 
=Project cost=
 +
[[File:Project_cost.JPG|600px|thumb]]
 +
 
4PM supports 3 types of cost monitoring:
 
4PM supports 3 types of cost monitoring:
*'''Organization costs''' - external costs (i.e subcontractors, suppliers, external co-workers)
+
*'''[[Project_costs_com/en/#Organization_costs |Organization costs]]''' - external costs (i.e subcontractors, suppliers, external co-workers)
*'''Peronnel costs''' - costs of our team members, directly connected to actual project work. The basis for the calculation is hourly fee and number of hours of work.
+
*'''[[Project_costs_com/en/#Personnel_costs |Personnel costs]]''' - costs of our team members, directly connected to actual project work. The basis for the calculation is hourly fee and number of hours of work.
*'''Indirect cost - overheads''' - calculation based on the calculation mode that is set in cost plan.
+
*'''[[Project_costs_plan_com/en/#Indirect_costs_.28overheads.29 |Indirect cost - overheads]]''' - calculation based on the calculation mode that is set in cost plan.
 
 
[[file:4.2.3.realiziraniStroski.jpg|600px|]]
 
  
==Stroški organizacij==
+
==Organization costs ==
Vpisujemo v zavihku '''FINANCE / REALIZIRANI STROŠKI''':
+
Are entered in tab '''FINANCE / ASSEMBLED COSTS'''
* v tabeli ''stroški organizacij'' kliknemo '''DODAJ''' in odpremo obrazec za vnos,
+
* click '''ADD''' under the table to open a form
* določimo ali je strošek vezan na projekt oz. fazo,
+
* set if new entry is project or phase cost
* izberemo tip stroška (iz plana stroškov),
+
* select cost type (connected to cost plan - only planned cost types can be selected)
* vpišemo plačnika in izdajatelja,
+
* enter PAYER and COST HOLDER
* izberemo nalogo, na katero se strošek povezuje,
+
* select task
* datum dokumenta, številko dokumenta,
+
* enter DOCUMENT DATE and NUMBER
* datum storitve in datum plačila in
+
* enter DATE OF SERVICE and PAYMENT DATE
* vrednost,
+
* enter the cost VALUE
* opis stroška
+
* enter cost DESCRIPTION (text field)
* strošku lahko pripnemo tudi dokument (npr. kopijo računa, pogodbe, dobavnice). Tu naloženi dokument je v mapi Finance.
+
* attach a document if necessary (copy of the invoice, contract). The document you upload here, is in the folder DOCUMENTS / FINANCE.
  
* če vpisujemo stroške, kjer so nosilci stroška člani projektnih ekip: v seznamu se pojavi, ko ima udeleženec na projektu dodeljeno nalogo; določimo, ali je oseba upravičena do povračila stroška
+
==Personnel costs - other==
 +
* When you enter a cost that is connected to team member you need to connect a cost with a task. This is possible if selected team member has allocated task.
 +
* Mark if a person is entitled to cost reimbursement.
 
 
[[file:4.5.3.2_RealiziraniStroski.jpg|500px|]]
+
[[File:Cost_entry_person.JPG|500px|thumb]]
  
'''Kompleksni (sofinanciranih) projektih''' moramo pri vnosu stroškov evidentirati: stroškovno področje, tip stroška, plačnik, izdajatelj, naloga, dokument, datum dokumenta, šifra dokumenta, datum plačila, vrednost neto, menjalni tečaj, vrednost neto v €, davek (%), vrednost bruto (EUR), vrednost bruto v (EUR), strošek, ki se poroča, izražen v izvirni valuti (EUR), strošek, ki se poroča, izražen v EUR.
+
==Personnel costs==
 +
Assembled cost include real-time overview of '''PERSONNEL COSTS''', result from entries of work done on task. The basis for personnel cost calculation is hourly fee X reported hours.
 +
Personnel cost show real-time overview actual project costs.  
  
==Stroški oseb==
+
===Important===
Med realiziranimi stroški so tudi '''stroški dela – stroški oseb - ure''', ki nastanejo z vnosom opravljenih ur na nalogah, osnova za izračun pa je urna postavka, ki jo ima posameznik v obdobju, ko je bilo delo opravljeno.  
+
If user has disabled hourly fee access than analytical overview of personnel cost cannot be seen (only number of reported hours is accessible).
  
===Pomembno===
+
=== Personnel costs - travel===
Če uporabnik nima omogočeno, da vidi urne postavke, potem ne more videti tudi analitičnih vpisov stroškov dela, vidi samo podatek o številu ur, ki so jih uporabniki vpisali na določen dan.
+
This overview assembles reported project travel costs by 4PM users. Travel costs can be reported to 4PM only if they are included in cost plan.
  
Posebej so zbrani stroški oseb, ki se nanašajo na službene poti - '''kilometrine''', ki so povezane s projekti. Tudi teh stroškov ni potrebno posebej evidentirati, saj jih vnaša vsak uporabnik 4PM sam, v '''MOJ 4PM / VNOS DELA IN STROŠKOV''' ali z izpolnjevanjem '''POTNIH NALOGOV''' (samo likvidirani potni nalogi).
+
Travel cost can be reported in 2 modes:
 +
* '''Work and expense entry (simple)'''
 +
* '''Travel orders''' (only available if Travel order module is included in the licence) - only liquidated Travel orders.
  
==Časovni filtri==
+
==Time filters==
Pregled poljubno sortiramo in filtriramo, pregledujemo. S klikom na ikono [[File:4.2.8.ikonaKljuc.jpg‎]] nastavimo časovni filter, ki vpliva na vse poglede v zavihku Finance:
+
Assembled cost overview can be set to various time frames with the use of '''time filters' on the top. To set default project overview click [[File:4.2.8.ikonaKljuc.jpg‎]] to select:
* po (koledarskih) mesecih
+
* by month (calendar)
* poljubno obdobje, ki ga določimo sami
+
* by project periods (set in SCORECARD)
* po obdobjih projekta, če so ta vnaprej določena
+
* custom
* samodejno - celo trajanje projekta.
+
* default overview is the project duration.
  
Če se premikamo po zavihkih znotraj modula finance, se nastavljene nastavitve ohranjajo (prenašajo).
+
When you move from tab to tab, set time frames stay the same.

Latest revision as of 16:15, 19 February 2016

Project cost

Project cost.JPG

4PM supports 3 types of cost monitoring:

  • Organization costs - external costs (i.e subcontractors, suppliers, external co-workers)
  • Personnel costs - costs of our team members, directly connected to actual project work. The basis for the calculation is hourly fee and number of hours of work.
  • Indirect cost - overheads - calculation based on the calculation mode that is set in cost plan.

Organization costs

Are entered in tab FINANCE / ASSEMBLED COSTS

  • click ADD under the table to open a form
  • set if new entry is project or phase cost
  • select cost type (connected to cost plan - only planned cost types can be selected)
  • enter PAYER and COST HOLDER
  • select task
  • enter DOCUMENT DATE and NUMBER
  • enter DATE OF SERVICE and PAYMENT DATE
  • enter the cost VALUE
  • enter cost DESCRIPTION (text field)
  • attach a document if necessary (copy of the invoice, contract). The document you upload here, is in the folder DOCUMENTS / FINANCE.

Personnel costs - other

  • When you enter a cost that is connected to team member you need to connect a cost with a task. This is possible if selected team member has allocated task.
  • Mark if a person is entitled to cost reimbursement.
Cost entry person.JPG

Personnel costs

Assembled cost include real-time overview of PERSONNEL COSTS, result from entries of work done on task. The basis for personnel cost calculation is hourly fee X reported hours. Personnel cost show real-time overview actual project costs.

Important

If user has disabled hourly fee access than analytical overview of personnel cost cannot be seen (only number of reported hours is accessible).

Personnel costs - travel

This overview assembles reported project travel costs by 4PM users. Travel costs can be reported to 4PM only if they are included in cost plan.

Travel cost can be reported in 2 modes:

  • Work and expense entry (simple)
  • Travel orders (only available if Travel order module is included in the licence) - only liquidated Travel orders.

Time filters

Assembled cost overview can be set to various time frames with the use of time filters' on the top. To set default project overview click 4.2.8.ikonaKljuc.jpg to select:

  • by month (calendar)
  • by project periods (set in SCORECARD)
  • custom
  • default overview is the project duration.

When you move from tab to tab, set time frames stay the same.