Person salaries/en/

From Help.4pm
Revision as of 16:27, 21 June 2013 by Writer (talk | contribs) (Created page with "===HOURLY RATE=== Hourly rate is set to the individual for a type of project in a specified period. This means that all entries of the work, which are carried out in a given peri...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

HOURLY RATE

Hourly rate is set to the individual for a type of project in a specified period. This means that all entries of the work, which are carried out in a given period are calculated using recorded hourly to get personnel costs by projects. A person can have for different types of projects varying hourly fee.

An individual can have set a single project hourly rate for a particular project, in this case the individual has a single hourly rate for the entire duration of the project (for example, the average hourly wage).

Complex projects (type: partner, cross-border cooperation, SEE) it is possible to manually change the different hourly rates for an arbitrary level of the reporting period of the project.