Import/hour-values/en
From Help.4pm
Jump to navigationJump to search
General about UP imports
The import is intended for projects that do not have a specific formula for calculating the hourly rate.
If the project has a calculation formula assigned to it, it is not shown in the list.
Steps
1. Prior to import, it is necessary to arrange the periods of hourly rates on the project.
2. Export the import template below and enter the data*.
*Mandatory information is email OR no. employee, hourly rate value, and period.
3. Click the blue select button to select the file.
4. Click the IMPORT button above the import table.
Notificationlegend:
"The period is not valid."
- This period does not exist on the project.
- This period of hourly rates is locked on the project.